Our Process
Our team will work with you through the process from our initial feasibility consultation to handing you the keys to your new Mod every step of the way.
Site Visit Option: If you are uncertain with site accessibility with respect to a flatbed truck (up to 75ft in length) and crane accessing within 30ft of the desired building location, we suggest going with the site visit option. This assessment is designed to review your property information for truck and crane logistics and to provide you with a budgetary estimate for the Mod, shipping, crane, installation and schematic design proposal to move onto the next step.
Once we have completed the Schematic Design and you have committed to the Design and Engineering Proposal, we will start on your architectural and engineered set drawings for your building permit submission.
Your local contractor must begin site preparation and foundation work at this time.
Once we confirm that your site is ready to receive your Mod, we then book the crane, trucks and send the Mod installation team to your site.
Once onsite, the Mod Installation Team coordinates with the Crane Operator to land the individual modules onto the foundation and complete the Mod installation.
Final walkthrough and keys are given to you.